Project Description: Comprehensive renovation of rooms 302–308 to reconfigure four laboratory spaces and two prep labs into two modern Physics laboratories supported by a shared prep room located between them.
Completed: August 2025
Project Description: Comprehensive renovation of rooms 302–308 to reconfigure four laboratory spaces and two prep labs into two modern Physics laboratories supported by a shared prep room located between them.
Completed: August 2025